Building integrated resilience management for a transport company

Profile
Industry
Transport and Critical Infrastructure
Company size
Corporate group with numerous business locations
Project Scope
Establishing integrated resilience management and conducting an RKEG readiness assessment
Focus
Resilience Management, RKEG, Risk Management, Business Continuity Management, ITSCM, Crisis Management, Readiness Assessment
Facing a similar task?

We are happy to discuss what BCM can look like in your organization.

Initial situation and challenge

The operator of critical infrastructure already had isolated structures and activities in the areas of risk management, BCM, ITSCM, crisis and emergency management, as well as physical security. With the requirements of the RKEG , the task arose to systematically consolidate these existing foundations, clarify interfaces, and establish verifiability regarding regulatory requirements.

A major challenge was the dependencies between business processes, locations, IT and OT services, technical facilities, service providers, and other organizational units. To build resilience management, these relationships had to be considered across existing management disciplines and responsibilities and control mechanisms coordinated.

The goal was therefore not to introduce yet another isolated management system, but to develop an integrated resilience management that brings together existing structures while simultaneously creating a robust basis for implementing and demonstrating the RKEG requirements.

Our approach

  1. RKEG Readiness Assessment: The current implementation status was assessed based on a structured maturity assessment. The evaluation covered the relevant RKEG thematic areas and enabled a unified review of existing measures, evidence, and outstanding requirements across the involved subject areas
  2. Gap analysis and action planning: The results of the evaluations were consolidated, open points were specifically tracked, and existing gaps identified. For identified action needs, concrete measures, responsibilities, and target dates were defined and transferred into overarching management.
  3. Building Integrated Resilience Management: Existing activities from risk management, BCM, ITSCM, crisis management, and physical security were consolidated into an overarching framework. Governance, roles, interfaces, control mechanisms, and resilience goals were defined as components of the target image.
  4. Integration of critical services and dependencies: Critical processes, resources, restart requirements, as well as technical and organizational dependencies were included in the resilience assessment. A particular focus was placed on dependencies across organizational boundaries and their importance for maintaining essential services.
  5. Management and regulatory traceability: The identified action needs were transferred into structured action tracking. This created a basis to centrally consolidate implementation statuses and traces and to continuously manage the maturity level of resilience management.

Results and Benefits

Success factors

Share case study

More practical examples

Cyber Crisis Exercise for a Financial Service Provider 2026
Building an NIS2-oriented Business Continuity Management System for a trading organization
Business Impact Analysis (BIA) for Insurance | DORA-compliant BCM development